Menü
Your Cart

Commissioning RFU/RFH

Commissioning RFU/RFH
Commissioning RFU/RFH
  • Marke: Sick
  • Modell: 1610018

SICK Commissioning RFU/RFH (1610018)

Product family: Product and system support Commissioning / Commissioning RFU/RFH

Category: Service and Support > SICK LifeTime Services > Product and system support > Commissioning

  • Adjustment:

    Preliminary analysis of possible influences of ambient conditions

    Inspection and possible correction of wiring and connection of the SICK product

    Alignment of the SICK product

    Adjustment of application-specific parameters; e.g., reading configuration, data processing, network/interfaces/inputs and outputs

    Creation of potentially necessary function blocks

    Filtering of overreaches with application-optimized settings

    Function and communication test

    Iterative process within the estimated work time in order to optimize the reading rate for the application

    Inspection of static or dynamic performance

    Verification tests on the sensor interface for the machine or plant with test objects and transponders provided by the customer – as comparison with the reference transponder

    Basic training for employees to explain how to operate the SICK product correctly

    Archiving of product parameters in a SICK database

SICK catalog source: https://www.sick.com/pl/en/commissioning/commissioning-rfu-rfh/p/p531961

WIR LIEFERN WELTWEIT

  • Die Lieferzeit hängt davon ab, ob das Produkt in unserem Lager vorrätig ist. Falls ja, ist ein superschneller Versand möglich. Andernfalls richten sich die Lieferbedingungen nach den Vorgaben des Herstellers.
  • Für Ihre Bequemlichkeit sorgen wir für den besten Preis und eine pünktliche Lieferung.
  • Wir arbeiten mit verschiedenen Transportdienstleistern weltweit zusammen. Superschnelle Lieferung ist verfügbar.